FUNCTIONAL MATERIAL CONVERTING FOR ELECTRONICSSHENZHEN, CHINA · 15+ YEARS TEAM EXPERIENCE
HOME/EXPLORE

From a drawing to a repeatable part.

Custom die-cut components and functional material converting for electronic assemblies.

CONVERTING CAPABILITIES

Choose the process around geometry, volume and delivery format.

From prototypes to continuous production, the process is selected around material behavior, tolerance, waste removal, presentation and assembly.

Roll-fed precision converting

Automated feeding for repeat-volume parts with controlled pitch, orientation, kiss-cutting and continuous waste removal.

Flatbed die cutting

Flexible sheet processing for thicker materials, larger outlines, lower quantities and multi-layer parts.

Laser prototypes

Verify outline, fit and assembly direction before production tooling is confirmed.

Multi-layer lamination

Combine adhesive, foam, films, foils, mesh and liners into one assembly-ready construction.

Kiss-cut & through-cut control

Define which layer is cut and which carrier remains, protecting liners and supporting clean pickup.

Slitting, sheeting & roll preparation

Match roll width, sheet size, pitch and winding direction to manual or automated assembly.

Waste removal & assembly presentation

Remove inner and outer waste, add pull tabs or split liners, and deliver by sheet, roll or protected tray.

Screen printing & registered secondary work

Review printed marks, windows, protective films and registered secondary features against the assembly datum.

ADDITIONAL PROCESS CAPACITY

Wanxin coordinates the processes and capacity each project requires.

These on-site photos show production, inspection and supporting processes. Wanxin confirms the production scope, inspection standards and delivery requirements for each project.

QUALITY INSPECTION ON SITEInspection, production and supporting processes
Quality inspection area
Quality inspection area
Manual assembly and inspection
Manual assembly and inspection
Quality inspection workstation
Quality inspection workstation
Material and work-in-process racks
Material and work-in-process racks
QUALITY CONTROL

A defined route from incoming material to release.

  1. 01Incoming material inspection
  2. 02Material release & tooling confirmation
  3. 03First-article inspection
  4. 04Production & IPQC
  5. 05Waste removal & inspection
  6. 06Packaging, QA sampling & warehousing
Team checking a drawing and part samples
DRAWING & SAMPLE REVIEW
Open full QC process image ↗
INSPECTION EQUIPMENT

Checks matched to the requirement.

Thermal aging oven

Thermal aging oven

Environmental and material conditioning support

Shore hardness tester

Shore hardness tester

Elastomer and foam hardness checks

Thickness gauge

Thickness gauge

Material and finished-part thickness checks

FROM RFQ TO PRODUCTION

Confirm the details that make a part ready to manufacture.

A useful RFQ is more than a shape. Wanxin reviews construction, tolerance, presentation, inspection and packing with the intended assembly process.

01

Drawing & critical dimensions

DXF, DWG, STEP, PDF or image; mark critical dimensions, holes and assembly datums.

02

Material & layer construction

Confirm grade, thickness, adhesive system, liner and the cut depth required for each layer.

03

Sample & first-article approval

Check fit, appearance, release sequence and agreed functional items before repeat production.

04

Delivery format for assembly

Choose individual pieces, sheets or rolls, including pitch, winding direction, tabs and split liners.

05

Inspection plan

Define incoming, first-article, in-process and outgoing checks around the drawing and acceptance standard.

06

Packing & lot traceability

Protect surfaces and edges, identify lots and retain the production and inspection records required by the project.

Have a different process or delivery requirement? Send it with the RFQ for an engineering review.

Send a custom requirement
SAMPLE SUPPORT · FAST RESPONSE

Tell us your requirement. Move the project forward.

Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.

01Initial RFQ response within 1 business hour+

After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.

02Engineering feedback typically within 4 business hours+

Drawing, material, process, tolerance and delivery questions are answered typically within 4 business hours after sufficient technical information is received.

03Project follow-up starts within 1 working day+

Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.

04Sample support for qualified projects+

Sample support is available for qualified projects after drawing, material and construction review. Timing depends on project requirements.

05Visible production progress+

Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.

SAMPLE SUPPORT · ONE-HOUR QUOTATION RESPONSE

Start with the problem. Add a drawing when available.

Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional. Qualified projects can request sample support.

Start a quick RFQ