Material options
Copper foil with conductive adhesive
Copper foil with non-conductive adhesive
Aluminum foil laminates
Conductive fabric tape
WANXIN PRECISION SHENZHEN WANXIN PRECISION DIE CUTTING CO., LTD.Thin grounding tabs, shielding overlaps and wrapped constructions made from copper foil, aluminum foil and conductive fabric tapes.
Thin grounding tabs, shielding overlaps and wrapped constructions made from copper foil, aluminum foil and conductive fabric tapes.

Copper foil with conductive adhesive
Copper foil with non-conductive adhesive
Aluminum foil laminates
Conductive fabric tape
Grounding between PCB and housing
Cable and connector shielding overlaps
Battery and display grounding tabs
EMI wrapping and edge contacts
Conductive adhesive requirement
Bend line and fatigue risk
Burr and exposed-edge control
Continuity and contact resistance
The final format and inspection plan are confirmed for each project before production.
Sheets, rolls or protected trays, with liner, pitch and orientation defined for manual or automated assembly.
First article, dimensions, appearance, layer construction and waste removal are checked against the approved requirement.
Finished parts receive final inspection, protected packaging and lot identification before shipment.
Start with the application and problem. Add the drawing, annual quantity and current material specification when available. We review DFM, propose the converting route and confirm sample support for qualified projects.
Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.
After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.
Drawing, material, process, tolerance and delivery questions are answered typically within 4 business hours after sufficient technical information is received.
Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.
Sample support is available for qualified projects after drawing, material and construction review. Timing depends on project requirements.
Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.
Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional. Qualified projects can request sample support.