FUNCTIONAL MATERIAL CONVERTING FOR ELECTRONICSSHENZHEN, CHINA · 15+ YEARS TEAM EXPERIENCE
HOME/EXPLORE

Insulation

Start with voltage, thickness and environmental requirements.

START WITH THE FAILURE MODE

Where can conductive parts touch—and how little space is available?

Start with voltage, thickness and environmental requirements.

01Symptom02Cause03Material & process04Verification

Choose the symptom closest to your project below. We then connect it to a cause, a manufacturable route and a verification method.

Too little space for insulation?
FUNCTION FIRST · MATERIAL SECOND
01 / PROBLEM DIAGNOSIS

What you see is only the symptom.

Open each route to see how the problem becomes a manufacturable, verifiable part.

01
WHAT THE CUSTOMER SEES

Short-circuit risk near metal housing or power parts

+
LIKELY CAUSE

Clearance is tight and a thin insulating part must avoid connectors, screws and heat paths.

WANXIN ENGINEERING ROUTE

Select PET, PI or PC film, then optimize windows, holes and edge coverage.

HOW TO VERIFY

Material, thickness, outline, edge distance and customer dielectric test.

Send this problem to engineering
02
WHAT THE CUSTOMER SEES

Thin edges lift, curl or shift during assembly

+
LIKELY CAUSE

Part geometry, backing liner or adhesive coverage does not support handling.

WANXIN ENGINEERING ROUTE

Add datum holes or removable tabs and protect the part with a suitable liner.

HOW TO VERIFY

Flatness, liner release, placement and surface condition.

Send this problem to engineering
02 / BUILD THE SOLUTION

Material, process and proof must work together.

01

Candidate materials

PET / PC insulation film

Polyimide film

Protective film

02

Converting route

Die cutting and waste removal

Multi-layer lamination

Tabs, windows and positioning holes

03

What to verify

Voltage and dielectric requirement

Thickness and edge clearance

Temperature and chemical exposure

03 / HELPFUL PROJECT INFORMATION

Share what you know. Missing details can be confirmed later.

  • Voltage / thickness / environment
  • Drawing, dimensions and critical tolerances, if available
  • Current material, expected volume and target schedule
  • Acceptance criteria and required validation
FREE SAMPLE · FAST RESPONSE

Tell us your requirement. Move the project forward.

Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.

01Quotation response within 1 hour+

After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.

02Workshop / engineering response within 4 hours+

Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.

03Project follow-up starts within 1 working day+

Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.

04Free samples in 1–3 days+

Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.

05Visible production progress+

Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.

FREE SAMPLE · ONE-HOUR QUOTATION RESPONSE

Start with the problem. Add a drawing when available.

Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.

Start a quick RFQ