What made the part difficult?
Corners, screw locations and joints can create uneven compression. Adhesive choice and liner design also affect whether the gasket is positioned correctly.
WANXIN PRECISIONSHENZHEN WANXIN PRECISION CUT CO., LTD.A closed-cell foam gasket follows the enclosure seal path to support water, dust and vibration control around the housing.
A closed-cell foam gasket follows the enclosure seal path to support water, dust and vibration control around the housing.

Corners, screw locations and joints can create uneven compression. Adhesive choice and liner design also affect whether the gasket is positioned correctly.
EVA / PE closed-cell foam
PORON or SEKISUI-type foam where specified
Silicone foam / rubber for temperature needs
Acrylic adhesive and release liner
Review compression around screws and corners
Avoid leak paths at joints
Add liner split or peel tab for placement
Foam and adhesive lamination
Precision through-cut or kiss-cut
Waste removal without stretching the gasket
Material grade, density and thickness
Outline, joint and hole position
Compression and recovery
Customer product-level water / dust and IP testing
The result fixes the approved construction, verification checkpoints and delivery standard needed for repeat production.
Seal path, screw clearances and corner compression fixed after sample review
Liner split and presentation defined for placement without stretching the gasket
Product-level water and dust acceptance remains tied to the customer enclosure test
Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.
After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.
Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.
Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.
Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.
Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.
Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.