What made the part difficult?
The contact area is limited, nearby geometry can interfere with assembly, and the liner must be easy to remove without deforming the copper foil.
WANXIN PRECISION SHENZHEN WANXIN PRECISION DIE CUTTING CO., LTD.A thin converted part used to create a repeatable grounding path where board, housing and cable space compete.
A thin converted part used to create a repeatable grounding path where board, housing and cable space compete.

The contact area is limited, nearby geometry can interfere with assembly, and the liner must be easy to remove without deforming the copper foil.
Copper foil construction
Pressure-sensitive adhesive
Release liner with handling tab
Review minimum web and corner radii
Keep adhesive away from the contact zone
Add a peel tab and assembly datum
Material lamination
Precision kiss-cut / through-cut
Waste removal and liner presentation
Critical outline dimensions
Contact-area location
Adhesive coverage and liner release
Grounding continuity and assembly trial by customer
The result fixes the approved construction, verification checkpoints and delivery standard needed for repeat production.
Sample construction approved for the customer assembly trial
Peel tab, adhesive keep-out and assembly datum fixed in the release drawing
Sheet or roll orientation and lot identification defined for repeat orders
Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.
After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.
Drawing, material, process, tolerance and delivery questions are answered typically within 4 business hours after sufficient technical information is received.
Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.
Sample support is available for qualified projects after drawing, material and construction review. Timing depends on project requirements.
Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.
Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional. Qualified projects can request sample support.