Material options
EVA / PE closed-cell foam
PORON and performance foam
PU and acrylic adhesive foam
Silicone foam and rubber by project
WANXIN PRECISIONSHENZHEN WANXIN PRECISION CUT CO., LTD.Single- and double-sided adhesive foam pads, cushioning feet, spacers and anti-slip parts converted for clean placement and repeatable assembly.
Single- and double-sided adhesive foam pads, cushioning feet, spacers and anti-slip parts converted for clean placement and repeatable assembly.

EVA / PE closed-cell foam
PORON and performance foam
PU and acrylic adhesive foam
Silicone foam and rubber by project
Housing and cover cushioning
Display, battery and module protection
Anti-slip feet and spacing pads
Vibration and gap compensation
Foam grade and compression range
Adhesive surface and peel strength
Cut edge, waste removal and cleanliness
Placement datum and delivery format
The final format and inspection plan are confirmed for each project before production.
Sheets, rolls or protected trays, with liner, pitch and orientation defined for manual or automated assembly.
First article, dimensions, appearance, layer construction and waste removal are checked against the approved requirement.
Finished parts receive final inspection, protected packaging and lot identification before shipment.
Start with the application and problem. Add the drawing, annual quantity and current material specification when available. We review DFM, propose the converting route and prepare free samples for feasible projects.
Start with your contact details and the problem. Add a drawing when available; we respond with the next step and keep progress visible through delivery.
After receiving usable project information, our sales and engineering team confirms receipt and returns the quotation or the specific information still needed.
Drawing, material, process, tolerance and delivery questions are passed to the responsible workshop or engineer for a practical answer.
Set up the review path, responsible contact, milestones and next actions so purchasing and engineering teams know the current status.
Samples are free. For feasible standard projects, samples can be prepared in 1–3 days after drawing and material confirmation.
Support progress photos and milestone updates through material preparation, production, inspection, packing and shipment.
Only four fields are required to start. PDF, DXF, DWG, STEP and images are optional; every project can request samples.